Start-up work
Start-up work includes qualified machine starting and staff training concerning to the work techniques, settings and services for trouble-free machine operation. Installation supervision supplies by the head specialist of Variobalt Copmany, who always trains on the machine factory of origin.
Start-up work terms:
The equipment should be unloaded out of transport in strict correspondence with the unloading instruction and do not have any damages.
You should unpack the machine in the presence of Variobalt representative.
To prepare dry and heated production unit for equipment installation.
Level floor and load capacity should be provided.
Free area for installation of the equipment in order to change the place of the loading-unloading unit.
The machine should stay on the destine place.
All communications should be pipe to the place of equipment. All connections are making by the customers.
Lifting mechanism and several staff persons should be provided if needed.
If you want to start start-up work you are to send us a request with the confirmation of above mentioned points.
The request must be sent 1 week beforehand.